These files are scans of authentic antique andcontemporary "L" maps from throughout the century.Just click on a name to see a large image of the map, cover, orinside booklet pages.
For those users with slower connections or whodo not wish to wait for these to download, we offer lower resolutionverions of some of our larger map files. Although these are lessreabable, they still give a good idea of what the maps looklike.
Chicago Elevated Railways 1913 Cover (168k) Issued to announce universal transfers, which took effect November 3, 1913
1925
System Map (276k)
J.P. Shealy Street Guide 1925 Cover (68k) Map of the Chicago Rapid Transit and North Shore Line systems. Map shows the Niles Center (Skokie) branch under construction.
1926
System Map (336k)
Chicago Rapid Transit 1933 Cover (1.1MB) Titled "Travel Map and Guide to Chicago's Attractions", this map edition was also published to coincide with the Century of Progress fair, and included not only information about how to get to the fair but information about points of interest and sightseeing by the "L".
1934
Front/System Map (4.6MB)
Back/Service Information (5.4MB)
Chicago Surface Lines 1935 Cover (270k) Map published by the Chicago Surface Lines company to explain the details of "L"-CSL transfers that were implemented by order of the Illinois Commerce Commission effective September 22, 1935. The map shows both the CSL and "L" systems, but only depicts the "L" stations where transfers can be made. The back includes extensive information about how transfers are issues and used. Chicago Rapid Transit 1936 Cover (376k) Map published to coincide with the inauguration of transfers between the "L" and the Chicago Motor Coach Company for an experimental period of one year beginning January 19, 1936, in addition to the transfers with CSL initiated in 1935. The map shows the "L", CSL and CMC systems, and denotes transfer stations. The back lists each transfer station and what CSL and CMC services it connects with, along with other details of how the transfers worked.
1936 NEW
Front/System Map (3MB)
Back/Transfer Information (4.1MB)
1938
Front/System Map (4.7MB)
Back/Transfer Information (5.2MB)
Chicago Rapid Transit 1938 Cover (196k) None
1942
System Map (640k)
Chicago Rapid Transit 1942 Cover (56k) Map has several war bonds advertisem*nts.
1943
System Map - North Side (708k)
System Map - South Side (616k)
Loop Map (412k)
Pamphlet Detail - Travel Times (72k)
Pamphlet Detail - Transfer Info (64k)
Chicago Rapid Transit 1943 Cover (390k) Shows a detailed map of the newly-opened State Street Subway in an expanded downtown inset that includes the Near North and Near South Sides. Back includes facts promoting newly opened subway.
1944
Front/System Map (945k)
Back/Service Information and Facts About Subway (5.5MB)
Rand McNally Street Guide 1944 Cover (92k) Includes detailed information on how to ride the elevated, including route descriptions, stopping patterns, and hours of operation. Map shows the newly-opened State Street Subway.
1948 NEW
System Map (468k)
Information page 1 (432k)
Information page 2 (180k)
Chicago Transit Authority 1948 Cover (290k) First map issued by the CTA; was largely a reprint of the last CRT map with minor changes.
1954
CTA System Map (4.4MB)
Back side of map (5.1MB)
Chicago Transit Authority 1954 Cover (40k) None
1957
CTA System Map (1.7MB) [Low resolution (420k)]
Chicago Transit Authority 1957 Cover (56k) None
1965
CTA System Map (1.2MB) [Low resolution (280k)]
Chicago Transit Authority January 1965 Cover (84k) Skokie Swift: "The Commuter's Friend" was the fourth in a series of progress reports published on the Skokie Swift demonstration project. Map shows the Skokie Swift's relation to the rest of the "L"TM system.
"L" System Map (112k)
Chicago Transit Authority 1965 Cover (52k) None
1970
CTA System Map (1.3MB) [Low resolution (216k)]
Chicago Transit Authority October 1970 Cover (60k) Includes newly-opened Dan Ryan and Kennedy routes. CTA® system map adopted one- and two-letter abbreviations for routes (i.e. "JH" for Jackson Park-Howard), though it would prove to be short-lived. Note ad for the #40 O'Harexpress bus extension route from Jefferson Park to the airport.
1975
CTA System Map (1.5MB) [Low resolution (328k)]
"L" System Map (192k)
Train Information: Routes, Fares, etc. (268k)
Chicago Transit Authority May 1975 Cover (72k) "L"TM system map adopted one- and two-letter abbreviations for routes.
1981
CTA System Map (1.3MB) [Low resolution (336k)]
"L" System Map (176k)
Train Information: Routes, Fares, etc. (268k)
Chicago Transit Authority Winter-Spring 1981 Cover (56k) None
1985
CTA System Map (1.5MB) [Low resolution (336k)]
Downtown Detail (264k)
Chicago Transit Authority 1985 Cover (60k) Map includes the new O'Hare extension and was the first to color-code the lines (although color names for the lines would not be adopted until 1993). "A" and "B" stations are no longer represented be triangles and squares; all stops are represented by circles.
1991
CTA System Map (1.5MB) [Low resolution (256k)]
Downtown Detail (228k)
Chicago Transit Authority March 1991 Cover (76k) First map issued after the passage of the Americans with Disabilities Act, outlining CTA's® accessible services on the rail and bus systems (see detail above).
1995
CTA System Map (includes downtown inset, route information, and more) (2.3MB) [Low resolution (376k)]
Pamphlet Detail: Accessible Services (100k)
Chicago Transit Authority July 1995 Cover (80k) Green Line appears on the map only as a dashed line, as it is closed for renovation.
1997
CTA System Map (1.2MB) [Low resolution (224k)]
Downtown Detail (268k)
"L" System Map (188k)
Train Information: Routes, Fares, etc. (408k)
Chicago Transit Authority January 1997 Cover (72k) None
1999
CTA System Map (1.2MB) [Low resolution (224k)]
Downtown Detail (296k)
"L" System Map (176k)
Train Information: Routes, Fares, Service Changes, etc. (272k)
Chicago Transit Authority Spring-Summer (March) 1999 Cover (84k) None
2000
CTA System Map (1.3MB) [Low resolution (252k)]
Downtown Detail (364k)
"L" System Map (180k)
Train Information: Routes, Fares, etc. (248k)
Regional Transportation Authority 2000 Cover (171k) None
2001
Six-County Regional System Map (1.4MB) [Low resolution (323k)]
Chicago System Map (1.5MB) [Low resolution (331k)]
Chicago Downtown Detail (636k)
Chicago Transit Authority Summer (May) 2001 Cover (64k) None
2003
CTA System Map (1.1MB) [Low resolution (156k)]
Downtown Detail (448k)
"L" System Map (300k)
Chicago Transit Authority Fall (September) 2003 Cover (111k) Includes revised lakefront express bus routes, revised Evanston bus routes, and the first new, accessible Douglas stations (54/Cermak and Kostner)
CTA System Map (2.1MB) [Low resolution (137k)]
Downtown Detail (691k)
"L" System Map (250k)
Train Information: Routes, Fares, etc. (636k)
| |